SPECIALIST ADVISORY / ROMANIA

CONTROL THE TECHNICAL PATH FROM CONNECTION ASSUMPTIONS TO ENERGISATION EVIDENCE.

We support Romanian solar, wind and BESS projects with technical grid-interface and compliance work covering studies, design inputs, protection, SCADA, energisation, testing and remediation.

We support Romanian solar, wind and BESS projects with technical grid-interface and compliance work covering studies, design inputs, protection, SCADA, energisation, testing and remediation. The focus is whether the project can demonstrate the technical evidence required for safe connection and operation.

ON THIS PAGE

02

Are the plant and network requirements aligned?

The decision in front of you

This service addresses technical studies, compliance evidence and delivery interfaces. Energy Law separately advises on ATR rights, connection agreements, regulatory procedure, permits and disputes.

Our response

A clear position. A practical next step.

Connection requirements are translated into controlled technical deliverables. Settings, tests, models and records are assembled for decisions and remediation.

03

What we do for you

We agree the depth of the review and the work needed for your decision. The scope can cover the following workstreams.

01

Grid and system studies

Inputs, assumptions, models, scenarios, consistency and design implications.

02

Connection design interface

Substation, lines, protection, control, metering, SCADA and communications.

03

Grid-code requirements

Technical requirements, models, capabilities, settings and compliance planning.

04

Readiness coordination

Prerequisites, procedures, responsibilities, safety and operator interfaces.

05

Compliance and performance tests

Test plans, witnessed evidence, results, deviations and retesting.

06

Technical issue resolution

Root cause, corrective options, programme impact and evidence closure.

04

How we move your matter forward

From instruction to delivery

Clear responsibilities, a documented position and actions tied to the next decision.

  1. 01

    Map requirements

    Create a controlled matrix of technical obligations, evidence and owners.

  2. 02

    Coordinate interfaces

    Align studies, design, equipment, settings, tests and operator actions.

  3. 03

    Close with evidence

    Track deviations and remediation to accepted technical records.

05

Start with the essentials

First conversation

  • connection requirements
  • solution study
  • dynamic model
  • protection study
  • SLD
  • SCADA list
  • energisation procedure
  • test plan
  • compliance report
Begin with a non-confidential summary and your timetable. We agree the document exchange after checking conflicts and the scope of the mandate.
06

Questions before you instruct us

What is technical grid-interface advisory?

It coordinates the studies, design, protection, control, SCADA, energisation, testing and evidence needed between the project and network operator.

Does this replace legal advice on the ATR?

No. Technical advisory addresses engineering requirements and evidence; Energy Law addresses rights, procedure, contracts and regulatory remedies.

Can you help after a failed compliance test?

Yes. The scope can cover evidence review, root-cause coordination, corrective options, retesting and closure reporting.

07

Other services for your matter

08

Discuss your project

Your next step

Tell us the issue, the parties involved and the decision date. We will agree the scope and next steps with you.

Contact our team

THE NEXT DECISION

LET’S MOVE
YOUR PROJECT
FORWARD.

Tell us your project stage, the decision ahead and your timetable.

Discuss your project+40 744 310710horia@grigorescupartners.ro